Courses

Starting dates:

   Please contact us for specific course dates and space availability.

Our 12 Week log building course covers all aspects of the log & timber building process.
  • Safe Work Habits, Site Safety, Tool Safety
  • Trade Sciences, Trade Practices
  • Blue Print Reading, Shop Drawings
  • Log Building Techniques, Log Span Tables, Building Standards
  • Log Wall Systems, Log end Curl Cuts
  • Door & Window Openings and Trim Cuts, Jig Building
  • Equipment Maintenance & Tools Sharpening
  • Log Milling Process and Techniques
  • Inventory of Materials, Calculations and Selection
  • Wall Framing Slots, Floor Systems, Floor Groove Slotting
  • Dimensional Framing to a Log Structures
  • Roof Structures Log & Timber Joinery
  • Calculating for Stairs, Landings, and Railings
  • Log Building Dismantle & Assemble preparation
  • Exterior & Interior Log Finishing
Please note:
  • For safety reason your chain saw must be no more than 10 years old.
  • All safety gear and tools must meet or exceed WCB regulations.
  • Students are responsible for the maintenance and safe keeping of the tools.
  • The Students are responsible for lost or misplaced tools that are in their care.

Safety Gear Requirements

  • Chainsaw Chaps
  • Hi Visibility Vests
  • Safety Glasses clear
  • Safety Sunglasses
  • Hard Hat with Face Screen and Ear Protection
  • Steel Toed Footwear without black marking soles
  • Good Rain gear Pants and Coat

Tool Requirements

  • Chainsaw 20”bar 65cc preferred husky/stihl
  • 7in Angle grinder with backing pad
  • Carpenter pouch with shoulder harness
  • Framing claw hammer
  • Ox head 2lb axe
  • Peavey 4ft-6in handle
  • 25’x 1-1/4”fat max stanley tape measure
  • Carpenter’s pencils 5+
  • Indelible pencils 5+
  • Set of log scribers with level bubbles
  • Large Olfa utility knife & extra blades
  • Framing chisels set-3 (1in-1 ½in-2in) preferred Sorby
  • 3in scarf slick , preferred Barr
  • Swiss gauge chisel # 8/35 or #7/35
  • Wooden or poly urethane mallet 2lb
  • Framing Squares (one 24in) (one 12in)
  • Chalk line
  • 2ft box beam level and 4ft box beam level